Qiaojiang Exhibition · est. 2012 Own 2,500 m² workshop in Dongyang, Zhejiang
1-hour on-site response during shows +86 182 6690 6685

Your stand in China, built by the factory — not a middleman

Qiaojiang designs, gets approved and builds exhibition stands for international exhibitors at Yiwu, Yongkang, Shanghai and across Zhejiang. Own 2,500 m² workshop. 58 stands completed in 2025. Quotations, drawings and site coordination in English.

Credentials Class I venue main contractorClass III Zhejiang qualification2,500 m² own workshopEnglish service
14yearsBuilding stands, nothing elseFounded 2012 in Yiwu. Exhibition work is the only business we do.
58standsCompleted in 202550+ projects a year, every year, since 2013.
2,619m²Largest single projectYongkang 2026: 99 exhibitors built in one venue, one show.
2,500m²Own workshopDongyang. 18 full-time craftsmen. We do not subcontract.
Why exhibitors from outside China work with us

Four things that go wrong when you hire a stand builder in China

We have spent fourteen years on the other side of these problems. Here is how we handle each one.

You cannot tell a factory from a broker

Half the companies quoting you are reselling someone else's workshop. We are the workshop: 2,500 m² in Dongyang, 18 full-time staff, nothing subcontracted. Come and inspect it, or ask for a video walk-through before you commit.

Chinese venue paperwork is a black box

Drawing submission, fire-safety review, power applications, contractor badges — each venue has its own rules and its own reasons for rejecting your drawings. We submit to these venues every week and know what they accept.

The quote never matches the invoice

Our rates are on this website. Truss US$110–150/m², aluminium US$170–230/m², timber US$250–330/m², turnkey and in dollars. The three charges the venue bills separately are listed on the pricing page, so nothing appears at the counter.

Nobody answers during the show

One-hour on-site response for the whole show — build-up, show days and dismantling. Our own crew, not a third party you have never met.

Pricing

Published rates. No enquiry required.

Almost no Chinese stand builder publishes prices. We do, because it saves both sides a week of guessing. These are turnkey rates for overseas exhibitors, in US dollars: design, drawings, venue approval, build and dismantling are all in the number.

Turnkey exhibition stand rates in China, 2026
SystemTurnkey rate36 m² standLead time
Truss + printed wrap
Truss frame, full-wrap printed graphic
US$110–150 per m² US$4,000–5,400 3–5 days
Aluminium system
Aluminium profile with panels or graphics
US$170–230 per m² US$6,100–8,300 5–7 days
Timber / custom build
Timber carcass, spray finish or vinyl wrap
US$250–330 per m² US$9,000–11,900 7–12 days

Minimum project value US$2,000 for stands below 18 m². Venue electricity, the special-construction management fee and the refundable deposit are billed by the exhibition centre, not by us — they are listed separately on the pricing page.

The workshop

Everything is made before it reaches the venue

Our workshop sits in Shenliang Village, Weishan Town, Dongyang — about an hour from the Yiwu venues. Timber, paint, graphics and electrical work all happen there, and every stand is trial-assembled before dispatch.

On site we only fit together. That is the difference between a build that finishes on schedule and one that runs into the opening ceremony. It is also why we can quote a fixed price: we are not buying labour by the day at the venue gate.

  • 18 full-time carpenters, painters, graphics staff and electricians
  • 6-person design team producing 3D and construction drawings
  • Trial assembly and photo sign-off before every dispatch
  • Structure and graphics stored between editions for repeat exhibitors
Inside the factory
Qiaojiang workshop in Dongyang — stand being prefabricated

Workshop floor, Dongyang. Every stand is pre-built here before it goes to the venue.

How it runs

From brief to handover

The full sequence, with the days each stage takes. Fifteen days before the build is the safe starting line.

  1. BriefSend the show name, booth number, floor area, budget and any brand guidelines. A floor plan helps but is not required.Day 0
  2. Concept & quoteFloor plan, 3D renders and an itemised quotation within 3 working days. Every material and process is listed separately.3 working days
  3. Sign-offWe revise until you approve. Then we issue construction drawings, material list and power point layout for venue submission.1–2 days
  4. Venue approvalDrawing submission, fire safety, power application, contractor badges — handled by us, progress reported to you.3–7 days
  5. Workshop prefabricationBuilt and pre-assembled in Dongyang. You receive photos of the trial assembly before it ships.5–7 days
Full process and timeline
Questions we get asked

Straight answers

How much does an exhibition stand cost in China?

Our 2026 turnkey rates for overseas exhibitors, in US dollars: truss with a full printed wrap US$110–150 per m², aluminium system stands US$170–230 per m², timber and custom builds US$250–330 per m². A 36 m² timber stand therefore lands at roughly US$9,000–11,900. The rate covers design, construction drawings, venue approval, fabrication, installation and dismantling — everything from the brief to the handover. Minimum project value is US$2,000; stands under 18 m² are quoted as a package. Venue power, the special-construction management fee and the refundable deposit are set by the exhibition centre and vary from venue to venue, so they are listed separately in your quotation. For scale, published European custom-build rates run €400–1,000 per m².

Do you work in English?

Yes. Enquiries, quotations, drawings, revision rounds and show-week coordination are all handled in English by email and WhatsApp. Our design team produces drawings to international convention, so nothing depends on verbal translation. On site we can join a video call if a decision needs to be made visually.

Can you handle the venue approval paperwork for us?

Yes, and this is usually the most valuable thing we do for overseas exhibitors. It covers drawing submission to the venue, fire-safety review, fire-retardant material certificates, power and water applications, contractor passes and worker badges. We know the submission rules and rejection habits of Yiwu International Expo Centre, Yongkang International Convention & Exhibition Centre, Shanghai NECC and the main Zhejiang venues.

How far in advance do we need to start?

Fifteen days before the build is the safe line. The standard sequence is: 3 working days for a 3D concept, 1–2 days to finalise construction drawings and submit them to the venue, 5–7 days of workshop prefabrication, then 2–3 days on site (3–5 days for large stands). Truss stands can be delivered in 3–5 days if the deadline is tight. Timber needs 7–12 days.

Are you the actual factory, or a broker?

We are the factory. 2,500 m² workshop in Shenliang Village, Weishan Town, Dongyang, with 18 full-time carpenters, painters, graphics staff and electricians on our own payroll. Nothing is subcontracted out. That is why we can commit to a build schedule and to a one-hour on-site response during the show.

All questions

Send us your booth number. Get a 3D concept and an itemised quote.

Tell us the show, the booth number and the floor area. Within 3 working days you get a floor plan, 3D renders and a line-by-line quotation. If the concept misses, you owe us nothing for the design.