Chinese venue approval and paperwork, handled for you
Drawing submission, fire safety, power applications and contractor badges. This is the part overseas exhibitors lose days to.
What we file on your behalf
- Construction drawings in each venue's required format and scale
- Fire-safety review, including fire-retardant certificates for timber and fabric
- Electrical application: total load, distribution points, 24-hour supply where needed
- Contractor passes, worker badges, vehicle access and delivery permits
- Double-deck structures: structural calculations and engineer sign-off
Why this is worth paying for
- Every venue applies its own rules, and they change between editions
- Rejected drawings cost a week — which is usually the week you do not have
- An unapproved power application means running extension cables across an aisle, which the venue will shut down
- We file to Yiwu, Yongkang, Cixi, Ningbo, Hangzhou and Shanghai NECC every month
The three documents that cause most rejections
- Fire-retardant certificates — must match the actual material, not a generic supplier sheet
- Structural drawings for anything above 4 metres or any suspended element
- Power load calculation — exhibitors routinely under-declare and then trip the hall circuit
Other services
01
Stand Design
3D renders, construction drawings and a material list in 3 working days. Revisions until you sign off.
02Custom Stand Build
Timber, aluminium or truss. Prefabricated in our own workshop, assembled on site by our own crew.
04Furniture & Equipment Rental
Furniture, lighting, AV, carpet and plants — rented per show instead of bought and shipped.
Send us your booth number. Get a 3D concept and an itemised quote.
Tell us the show, the booth number and the floor area. Within 3 working days you get a floor plan, 3D renders and a line-by-line quotation. If the concept misses, you owe us nothing for the design.